EFFECTIVE PROJECT INTERFACE MANAGEMENT FOR COMPLEX BUILDING PROJECTS
DOI:
https://doi.org/10.5281/zenodo.14590922Keywords:
EFFECTIVE, COMPLEX BUILDING, technological, DocumentationAbstract
By reason of technological advancements, many engineering projects are becoming larger and more complex. Numerous stakeholders collaborate with one another throughout the life cycle of a project from varying work cultures and different geographical locations. Improving alignment of stakeholders and minimizing project issues and conflicts can be realized with Interface Management Systems. The matter of identifying and monitoring interfaces are quite a significant challenge. Generally, the links between stakeholders, construction or manufacturing elements and project scopes are Interfaces. Deficiencies in project cost, quality and time in its execution lifecycle or failure after delivery of project could arise as a result of poor Interface Management. Thus, it is obvious that project performance during and after execution is dependent on the Interface management employed. This paper employs a process based approach in the Interface management of large scale projects in the following order: Identification, Documentation, Issuing, Communication and Closing.
References
Chen , Q.; Reichard, G. and Beliveau, Y. (2007) : “Interface Management: A Facilitator of Lean Construction and Agile Project Management „?15thAnnual ConferenceoftheInternationalGroupforLeanConstruction,East
lansing,MI,57-66
Crumrine,T.;Nelson,R.C.;Loudermilk,C.M.andMalbrel,C.A.(2005):“Interface Management for Subsea and Control Completions” Offshore 65(10)
Designing Buildings Ltd (2021):A Solution to Handle Large and Complex Construction Projects :Interface Management. Available @www.designingbuildings.co.ukAccessed April 26 , 2021
Flyvbjerg,B.(2014):What You Should Know About Megaprojects and Why-An Overview. Project Management Journal , 45(2) , Pp6-19
Morris,P.W.G.(1979):InterfaceManagement-AnOrganizationTheoryApproach toProjectManagement.Available@https://www.pmi.org/learning/library……. Accessed : April 26 , 2021
Noteboom, U. (2004): “Interface Management Improves on-time, on-budget Delivery of Megaprojects.??Society of Petroleum Engineers,August (2004)
Pavitt, T.C.and Gibb, A.G.F. 2003: ”Interface Management Within Construction: In Particular, Building Facade”. Journal of Construction Engineering and Management129(1), Pp8-15
Prieto, B. (2015) :Is It Time To Rethink ProjectManagement Theory ? PM World Journal, iv (iii)
Samin,S.;Carl,H.;Mahdi,S.;Kelly,M.;etal(2012)InterfaceManagementModel forMega Capital Projects.Available@ https://www.researchgate.net/publication /26Accessed: April 26, 2021
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 IPHO-Journal of Advance Research in Science And Engineering

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Author(s) and co-author(s) jointly and severally represent and warrant that the Article is original with the author(s) and does not infringe any copyright or violate any other right of any third parties and that the Article has not been published elsewhere. Author(s) agree to the terms that the IPHO Journal will have the full right to remove the published article on any misconduct found in the published article.